WCPI search results

[new search]

6 results (sorted by title)

Display as: brief entries full entries data grid

add to order image no. contact sheet collection creator title description subject(s) date
58284 A1784 City of Winnipeg Hydro Collection     Construction Of The Winnipeg Hydro Dam At Pointe Du Bois, Mb  ConstructionDamsHydro 1920, December 26
58283 A1784 City of Winnipeg Hydro Collection     Construction Of Winnipeg Hydro Dam At Pointe Du Bois Mb  ConstructionDamsHydro 1920, December 26
58285 A1784 City of Winnipeg Hydro Collection     Construction Of Winnipeg Hydro Dam At Pointe Du Bois, Mb  ConstructionDamsHydro 1920, December 15
58282 A1784 City of Winnipeg Hydro Collection     Construction Of Winnipeg Hydro Dam At Pointe Du Bois, Mb  ConstructionDamsHydro 1920, December 6
6612 A0207 James A. Richardson Collection     Post Office Department Authorized A Special Trip Between Fort Mc Murray & Fort Smith To Carry Xmas Mail. Round Trip Covered 600 Miles & Performed In 24 Days. Dog Team Seen Ready To Leave Fort Mc Murray. (L- R): Mr. Petty, Hbc Mgr.; Col. J.K. Cornwall (Apostle Of The North); R.W. Hale,P.O. Dept. ; Mr. Mcdougal, Dog Team Driver  Dog SledsDogsFortsPersonalities 1920, December
38810 A1296 Winnipeg Free Press Collection     The City Hotel, On Main Street In Winnipeg Across From City Hall, After The Fire Which Destroyed It  FiresHotelsWinnipeg BuildingsWinnipeg Streets 1920, December 14